Shop Refurbishment Photos.

#

Here we are before the job started removing posters etc. to clear the shop.

#

View from the back of the shop






Pictures below are almost a panoramic shot showing the new steel bases with fresh concrete or ready for the concrete to be cast.

##
#

 

Here we are in happy chaos. We are constantly moving the machinery around.  This view through to the back of the shop shows the paypoint corner.
#
The best way to run new wiring, Hot and Cold water, drains and the paypoint wires is through a set of ducts across the shop floor. (View to dryers)
#
The best way to run new wiring, Hot and Cold water, drains and the paypoint wires is through a set of ducts across the shop floor. (View to washers.)
#
The best way to run new wiring, Hot and Cold water, drains and the paypoint wires is through a set of ducts across the shop floor.
#
The best way to run new wiring, Hot and Cold water, drains and the paypoint wires is through a set of ducts across the shop floor.
#
The best way to run new wiring, Hot and Cold water, drains and the paypoint wires is through a set of ducts across the shop floor.
#
The best way to run new wiring, Hot and Cold water, drains and the paypoint wires is through a set of ducts across the shop floor.
#
Machines on the plinth at last.
#
New large washers. (16lb.) The in-fill to the LHS of the machines (now only four where there used to be five) gives space for an extra dryer.
#
New Mammoth and Jumbo size washers. (40lb and 30lb)

 

#
Our new paypoint up and running.



The job has yet to be completed. We had a few delays deciding on a new/second hand dryer, and couldn't commit to a new floor until the dryer was put in place.